Abstract :
The procurement of a pre-series of 90 Main Dipole was decided as the first step towards the series production of 1232 Arc Main Dipoles within the LHC magnet program. The pre-series production is already completed at one Contractor´s site and is approaching the completion at the other two companies. Technical aspects: manufacturing tolerances, manufacturing difficulties, first evaluation on Non-Conformities appearing during production and a short overview of magnet performance are presented.
Keywords :
accelerator magnets; proton accelerators; synchrotrons; 1232 Arc Main Dipoles; 90 Main Dipole preseries procurement; LHC magnet program; LHC main dipole preseries production; contractor site; magnet performance; manufacturing difficulties; manufacturing tolerances; nonconformities; technical aspects; Accelerator magnets; Coils; Conductors; Contracts; Large Hadron Collider; Magnetic heads; Manufacturing; Notice of Violation; Procurement; Production;
Conference_Titel :
Particle Accelerator Conference, 2003. PAC 2003. Proceedings of the
Print_ISBN :
0-7803-7738-9
DOI :
10.1109/PAC.2003.1288729