• DocumentCode
    408902
  • Title

    Status of the Midwest Proton Radiotherapy Institute

  • Author

    Anferov, V. ; Collins, J. ; Friesel, D.L. ; Jones, W.P. ; Katuin, J. ; Klein, S.B. ; Schreuder, A.N.

  • Author_Institution
    Cyclotron Facility, Indiana Univ., Bloomington, IN, USA
  • Volume
    1
  • fYear
    2003
  • fDate
    12-16 May 2003
  • Firstpage
    699
  • Abstract
    Phase I construction of the Indiana University Midwest Proton Radiotherapy Institute (MPRI), including many reliability upgrades to the IUCF k220 cyclotron, construction of a variable energy proton Beam Delivery System (BDS), a horizontal beam Treatment Room with a Large Field Nozzle, and a Medical Clinic, is now complete. Commissioning of the BDS and the Large Field Nozzle is underway. Patient Treatment with this nozzle is scheduled to begin in late July 2003. This contribution discusses the unique features of the MPRI Cancer Treatment facility and the present Phase I commissioning results. In addition, two 360° rotating gantry systems were purchased from IBA in December 2002 for Phase II construction. The first gantry is scheduled for delivery in July 2003. The Phase II construction and installation schedule will also be briefly presented.
  • Keywords
    cyclotrons; particle beam diagnostics; proton accelerators; radiation therapy; Large Field Nozzle; Medical Clinic; Midwest Proton Radiotherapy Institute; horizontal beam Treatment Room; reliability upgrades; variable energy proton Beam Delivery System; Cyclotrons; Energy measurement; Ferrites; Magnets; Medical treatment; Particle beams; Production systems; Protons; Structural beams; Switches;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2003. PAC 2003. Proceedings of the
  • ISSN
    1063-3928
  • Print_ISBN
    0-7803-7738-9
  • Type

    conf

  • DOI
    10.1109/PAC.2003.1289013
  • Filename
    1289013