DocumentCode
408902
Title
Status of the Midwest Proton Radiotherapy Institute
Author
Anferov, V. ; Collins, J. ; Friesel, D.L. ; Jones, W.P. ; Katuin, J. ; Klein, S.B. ; Schreuder, A.N.
Author_Institution
Cyclotron Facility, Indiana Univ., Bloomington, IN, USA
Volume
1
fYear
2003
fDate
12-16 May 2003
Firstpage
699
Abstract
Phase I construction of the Indiana University Midwest Proton Radiotherapy Institute (MPRI), including many reliability upgrades to the IUCF k220 cyclotron, construction of a variable energy proton Beam Delivery System (BDS), a horizontal beam Treatment Room with a Large Field Nozzle, and a Medical Clinic, is now complete. Commissioning of the BDS and the Large Field Nozzle is underway. Patient Treatment with this nozzle is scheduled to begin in late July 2003. This contribution discusses the unique features of the MPRI Cancer Treatment facility and the present Phase I commissioning results. In addition, two 360° rotating gantry systems were purchased from IBA in December 2002 for Phase II construction. The first gantry is scheduled for delivery in July 2003. The Phase II construction and installation schedule will also be briefly presented.
Keywords
cyclotrons; particle beam diagnostics; proton accelerators; radiation therapy; Large Field Nozzle; Medical Clinic; Midwest Proton Radiotherapy Institute; horizontal beam Treatment Room; reliability upgrades; variable energy proton Beam Delivery System; Cyclotrons; Energy measurement; Ferrites; Magnets; Medical treatment; Particle beams; Production systems; Protons; Structural beams; Switches;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2003. PAC 2003. Proceedings of the
ISSN
1063-3928
Print_ISBN
0-7803-7738-9
Type
conf
DOI
10.1109/PAC.2003.1289013
Filename
1289013
Link To Document