DocumentCode :
408976
Title :
The LANSCE RICE control system upgrade
Author :
Oothoudt, Michael ; Schaller, Stuart ; Bjorklund, Eric ; Burns, Mary ; Carr, Gary ; Faucett, John ; Hayden, David ; Lusk, Matthew ; Merl, Robert ; Potter, Jerry ; Reynolds, Jerome ; Romero, Dolores ; Shelley, Fred, Jr.
Author_Institution :
Los Alamos Nat. Lab., NM, USA
Volume :
4
fYear :
2003
fDate :
12-16 May 2003
Firstpage :
2354
Abstract :
The LANSCE (Los Alamos Neutron Science Center) control system upgrade program continues with the impending replacement of the RICE (Remote Instrumentation and Control Equipment) subsystem. The RICE subsystem upgrade is a challenge because of its technology (late 1960´s), number of channels (>10,000), and unique characteristics (all-modules data takes, timed/flavored data takes). The plan is to replace at least the nontimed data and the command portions of the subsystem with Programmable Logic Controllers (PLCs). We discuss motivations, technological challenges, proof-of-principle, and planning. The boundary condition, as usual, is that we must implement these major changes on a running accelerator.
Keywords :
accelerator control systems; beam handling equipment; linear accelerators; programmable controllers; LANSCE RICE control system upgrade; Los Alamos Neutron Science Center; PLC; RICE subsystem; Remote Instrumentation and Control Equipment; all-modules data; flavored data; linac; nontimed data; programmable logic controller; timed-data; CAMAC; Control systems; Costs; Hardware; Instruments; Laboratories; Linear particle accelerator; Neutrons; Programmable control; Proposals;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Particle Accelerator Conference, 2003. PAC 2003. Proceedings of the
ISSN :
1063-3928
Print_ISBN :
0-7803-7738-9
Type :
conf
DOI :
10.1109/PAC.2003.1289116
Filename :
1289116
Link To Document :
بازگشت