DocumentCode
409236
Title
Status of the integrated RFQ-drifttube-combination for the medicine-synchrotron in Heidelberg
Author
Bechtold, A. ; Ratzinger, U. ; Schempp, A. ; Schutt, B.
Author_Institution
IAP, Johann Wolfgang Goethe Univ., Frankfurt, Germany
Volume
2
fYear
2003
fDate
12-16 May 2003
Firstpage
1062
Abstract
Design and construction of the RFQ including an integrated rebunching section as a part of the LINAC system is our contribution to the medicine project in Heidelberg. The building of the machine has been finished, first rf-measurements at low power have been done. The concept of assembling, especially the alignment of the electrodes, and the results of the rf-measurements will be presented.
Keywords
accelerator RF systems; particle beam bunching; particle beam diagnostics; synchrotrons; Heidelberg medicine-synchrotron; LINAC system; integrated RFQ-drifttube-combination; integrated rebunching section; rf-measurements; Assembly; Biomedical electrodes; Boosting; Buildings; Linear particle accelerator; Manufacturing; Particle beams; Shape; Structural beams; Switches;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2003. PAC 2003. Proceedings of the
ISSN
1063-3928
Print_ISBN
0-7803-7738-9
Type
conf
DOI
10.1109/PAC.2003.1289605
Filename
1289605
Link To Document