• DocumentCode
    409337
  • Title

    Fabrication, test and first operation of superconducting accelerator modules for storage rings

  • Author

    Bauer, S. ; Pekeler, M. ; Peiniger, M. ; Vogel, H. ; Stein, P. Vom ; Belomestnykh, S. ; Padamsee, H. ; Quigley, P. ; Sears, J.

  • Author_Institution
    ACCEL Instruments GmbH, Bergisch Gladbach, Germany
  • Volume
    2
  • fYear
    2003
  • fDate
    12-16 May 2003
  • Firstpage
    1410
  • Abstract
    The production of 6 superconducting 500 MHz modules for Cornell University, the Taiwan Light Source and the Canadian Light Source is almost finished. We summarize the vertical cavity test results and report on cold module tests. Operational experience with the delivered modules is also presented. Furthermore a 1.5 GHz superconducting Landau module is under production at ACCEL. The status of this project will be discussed.
  • Keywords
    accelerator cavities; particle beam dynamics; storage rings; superconducting cavity resonators; 1.5 GHz; 500 MHz; cold module tests; fabrication; first operation; storage rings; superconducting Landau module; superconducting accelerator modules; vertical cavity test; Assembly; Business continuity; Electronic equipment testing; Fabrication; Instruments; Life estimation; Light sources; Production; Radio frequency; Storage rings;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2003. PAC 2003. Proceedings of the
  • ISSN
    1063-3928
  • Print_ISBN
    0-7803-7738-9
  • Type

    conf

  • DOI
    10.1109/PAC.2003.1289722
  • Filename
    1289722