• DocumentCode
    414017
  • Title

    A multi-agent cell controller integrating temporal and precedence constraints: application issues

  • Author

    Bouzouia, B. ; Bouchemma, R.

  • Author_Institution
    Div. Robotique et Productique, Centre de Developpement des Technol. Avancees CDTA, Alger, Algeria
  • Volume
    1
  • fYear
    2004
  • fDate
    26 April-1 May 2004
  • Firstpage
    523
  • Abstract
    This work presents a flexible cell controller based on the multi-agent approach. The main goal of the approach resides in the total distribution of the scheduling and control functions and support of temporal and precedence constraints between tasks during scheduling process. Contract Net protocol was the protocol adopted for scheduling and rescheduling process. An implementation of the proposed architecture is discussed.
  • Keywords
    cellular manufacturing; control engineering computing; distributed control; flexible manufacturing systems; multi-agent systems; production control; production engineering computing; protocols; scheduling; Contract Net protocol; flexible cell controller; multiagent cell controller; precedence constraint; scheduling process; temporal constraint; Communication system control; Computer architecture; Control systems; Flexible manufacturing systems; Job shop scheduling; Manipulator dynamics; Process planning; Programmable control; Protocols; Robots;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Robotics and Automation, 2004. Proceedings. ICRA '04. 2004 IEEE International Conference on
  • ISSN
    1050-4729
  • Print_ISBN
    0-7803-8232-3
  • Type

    conf

  • DOI
    10.1109/ROBOT.2004.1307202
  • Filename
    1307202