DocumentCode :
416571
Title :
Imprecise computation technique to schedule AND/OR tasks with global end-to-end deadline in distributed real-time systems
Author :
El-Haweet, W.A. ; El-Meligy, H.H. ; El-Salam, I. Abd
Author_Institution :
Dept. of Comput. Sci. & Autom. Control, Alexandria Univ., Egypt
Volume :
1
fYear :
2003
fDate :
4-6 Aug. 2003
Firstpage :
663
Abstract :
Directed acyclic graphs (DAGs) are used to represent AND/OR precedence constraint systems where AND tasks are ready to execute when all of their direct predecessors are completed and OR tasks are ready to execute when one or more but not necessarily all of their direct predecessors are completed. A proposed imprecise computation technique ICT is introduced to maximize the solution quality within the available time. To examine and evaluate ICT, a random graph generator algorithm (RGG) is created to provide a wide range of random DAGs to be used in the simulation experiments.
Keywords :
constraint handling; directed graphs; processor scheduling; real-time systems; AND/OR precedence constraint systems; directed acyclic graphs; distributed real-time systems; global end-to-end deadline; imprecise computation technique; real-time scheduling; simple flexible scheduling model;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
SICE 2003 Annual Conference
Conference_Location :
Fukui, Japan
Print_ISBN :
0-7803-8352-4
Type :
conf
Filename :
1323449
Link To Document :
بازگشت