Title
Look Ahead Robust Scheduling of Wind-Thermal System With Considering Natural Gas Congestion
Author
Cong Liu ; Changhyeok Lee ; Shahidehpour, Mohammad
Author_Institution
Decision & Inf. Sci., Argonne Nat. Lab., Argonne, IL, USA
Volume
30
Issue
1
fYear
2015
fDate
Jan. 2015
Firstpage
544
Lastpage
545
Abstract
Natural gas pipeline congestion will impact on the fuel adequacy of several natural gas fired generating units at the same time. This letter focuses on the development of a robust optimization methodology for the scheduling of quick start units when considering natural gas resource availability constraints. Natural gas transmission will be approximated by linear constraints, and the linepack capacity of pipelines will be considered in the proposed model. Case studies show the effectiveness of the proposed model and algorithms.
Keywords
natural gas technology; optimisation; pipelines; power generation scheduling; thermal power stations; wind power plants; look ahead robust scheduling; natural gas congestion; natural gas fired generating units; natural gas pipeline congestion; natural gas resource availability constraints; natural gas transmission; wind-thermal system; Mathematical model; Optimization; Pipelines; Processor scheduling; Robustness; Uncertainty; Natural gas electric coordination; renewable energy; robust optimization; unit commitment;
fLanguage
English
Journal_Title
Power Systems, IEEE Transactions on
Publisher
ieee
ISSN
0885-8950
Type
jour
DOI
10.1109/TPWRS.2014.2326981
Filename
6827255
Link To Document