DocumentCode
424184
Title
Two stage case-based reasoning application research on steel-making dynamic scheduling
Author
Chang, Chun-guang ; Wang, Ding-wei ; Hu, Kun-Yuan ; Zheng, Bing-lin
Author_Institution
Sch. of Information Sci. & Eng., Northeastern Univ., Shenyang, China
Volume
4
fYear
2004
fDate
26-29 Aug. 2004
Firstpage
2116
Abstract
The purpose of this paper is to solve dynamic scheduling complex problem during steel making. To realize system stability, the 2-stage CBR (case-based reasoning) rather than conventional one-stage CBR is proposed. The framework of the 2-stage CBR is presented firstly. Then, its application to steel-making dynamic scheduling is introduced in detail such as case representation, case classifying, case retrieval, case adaptation, case evaluation, and case maintenance. Furthermore, the prototype system is developed and the running result obtains satisfactory result on system velocity, validity and stability. With the prototype system further perfected, it is put into application with benefits expected.
Keywords
case-based reasoning; dynamic scheduling; steel manufacture; case adaptation; case classification; case evaluation; case maintenance; case representation; case retrieval; case-based reasoning; prototype system; steel-making dynamic scheduling; Decision making; Dynamic scheduling; Engineering management; Information science; Problem-solving; Processor scheduling; Prototypes; Stability; Steel; Technology management;
fLanguage
English
Publisher
ieee
Conference_Titel
Machine Learning and Cybernetics, 2004. Proceedings of 2004 International Conference on
Print_ISBN
0-7803-8403-2
Type
conf
DOI
10.1109/ICMLC.2004.1382147
Filename
1382147
Link To Document