DocumentCode
425521
Title
Scheduling a two-stage no-wait hybrid flowshop with separated setup and removal times
Author
Chang, Junlin ; Yan, Weiwu ; Shao, Huihe
Author_Institution
Dept. of Autom., Shanghai Jiao Tong Univ., China
Volume
2
fYear
2004
fDate
June 30 2004-July 2 2004
Firstpage
1412
Abstract
This paper studies the two-stage no-wait hybrid flowshop scheduling problem where one of the two stages consists of several identical parallel machines and the setup and removal times of each job at each stage are separated from the processing time. In view of the NP-complete of this problem, heuristic algorithms regarding sequencing and assigning of jobs to each stage as independent procedure are proposed. Two theorems are also proposed for sequencing job procedure. Computational experience demonstrates the effectiveness of the heuristic algorithm including the proposed theorems in finding a near optimal schedule.
Keywords
computational complexity; flow shop scheduling; job shop scheduling; optimisation; NP-complete problems; flowshop scheduling problem; heuristic algorithms; job assignment; parallel machines; processing time; removal times; sequencing jobs; two stage no wait hybrid scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
American Control Conference, 2004. Proceedings of the 2004
Conference_Location
Boston, MA, USA
ISSN
0743-1619
Print_ISBN
0-7803-8335-4
Type
conf
Filename
1386773
Link To Document