DocumentCode :
426118
Title :
Operations planning for a two-stage production system under lumpy demand
Author :
Ding-zhong Feng ; Yamashiro, M.
Author_Institution :
Coll. of Mechatronical Eng., Zhejiang Univ. of Technol., Hangzhou, China
Volume :
2
fYear :
2004
fDate :
Sept. 28 2004-Oct. 2 2004
Firstpage :
1257
Abstract :
This paper considers a two-stage production delivery system that incorporates a fixed quantity supply of finished goods to a buyer at a fixed interval of time. The problem is to decide an optimal batch size and raw-material ordering policy for such a system. A general cost model is formulated considering both supplier (of raw materials) and buyer (of finished products) sides. Then an optimal solution to the problem is derived on basis of the cost model. We also analyze the sensitivity of raw materials ordering and production lot size to changes in ordering cost, transportation cost and manufacturing setup cost. A pragmatic computation approach for operational situations is developed to solve integer approximation solution. Finally, some numerical examples are given to demonstrate the optimal solution and computational approach.
Keywords :
decision making; lot sizing; production planning; raw materials; general cost model; integer approximation solution; lumpy demand; manufacturing setup cost; operations planning; optimal batch size; pragmatic computation approach; production lot size; raw-material ordering policy; sensitivity analysis; transportation cost; two-stage production system; Computational efficiency; Computer aided manufacturing; Cost function; Educational institutions; Inventory management; Paper technology; Production planning; Production systems; Raw materials; Transportation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Intelligent Robots and Systems, 2004. (IROS 2004). Proceedings. 2004 IEEE/RSJ International Conference on
Conference_Location :
Sendai
Print_ISBN :
0-7803-8463-6
Type :
conf
DOI :
10.1109/IROS.2004.1389568
Filename :
1389568
Link To Document :
بازگشت