• DocumentCode
    430034
  • Title

    A supplier perspective on rapid new product volume ramp-up manufacturing strategy

  • Author

    Li, H.H.J.K. ; Shi, Y.J. ; Gregory, M.J.

  • Author_Institution
    Inst. for Manufacturing, Cambridge Univ., UK
  • Volume
    1
  • fYear
    2004
  • fDate
    18-21 Oct. 2004
  • Firstpage
    324
  • Abstract
    This paper highlights that weak production volume ramp up capability can be a major impediment for a supplier to thrive in a tightly linked overseas Japanese collaborative manufacturing supply network. An exploratory multiple-case longitudinal research methodology was adopted in this study involving two large Japanese MNCs and their respective supply networks consist of ten factories in four countries. The preliminary findings suggest that a supplier attaining rapid ramp up capabilities can enhance the predictability of initial production output during new product volume ramp up. Thus the new supplier gains immediate customer trust on the ability to deliver the committed product/services and consequently leads to increase in future business opportunities.
  • Keywords
    international collaboration; manufacturing industries; supply chain management; collaborative manufacturing supply network; exploratory multiple-case longitudinal research methodology; manufacturing strategy; product volume ramp-up capability; Collaboration; Costs; Delay; Impedance; Milling machines; Production facilities; Pulp manufacturing; Scheduling; Timing; Uncertainty;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Engineering Management Conference, 2004. Proceedings. 2004 IEEE International
  • Print_ISBN
    0-7803-8519-5
  • Type

    conf

  • DOI
    10.1109/IEMC.2004.1407128
  • Filename
    1407128