DocumentCode
437446
Title
Aspects of testing and commissioning of power systems for RTS system with Sengkang LRT as case study
Author
Melvyn Thong, T.L. ; Beng, Yeo Kok ; Khoon, Chia Song
Author_Institution
Land Transp. Authority, Singapore
Volume
2
fYear
2004
fDate
21-24 Nov. 2004
Firstpage
1880
Abstract
The Sengkang light rail transit (LRT) system is the second LRT system in Singapore which was opened for revenue service on 18 Jan 2002. The LRT comprises the East Loop and West Loop of about 5km and 8km tracks respectively. The East Loop consists of 5 LRT stations and the West Loop consists of 8 LRT stations. There is one LRT interchange station which is integrated with the North-East line (NEL) and Sengkang bus-interchange to provide seamless transfer for the commuters. The LRT is operated on a driverless and single-train configuration. A depot was provided for both the Sengkang LRT and the future Punggol LRT for maintenance and stabling of the trains. This paper describes the aspects of site testing & commissioning of power systems for rail transit system (RTS) with Sengkang LRT as a case study. The paper outlines the major tests conducted for Sengkang LRT to ensure the operation and safety requirements of the power systems are met prior to the revenue service.
Keywords
commissioning; light rail systems; maintenance engineering; power system security; rapid transit systems; Sengkang bus-interchange; Singapore; light rail transit system; maintenance engineering; power system commissioning; power system safety; rail transit system; revenue service; Computer aided software engineering; Light rail systems; Power distribution; Power supplies; Power system protection; Power system reliability; Power systems; Switchgear; System testing; Transformers;
fLanguage
English
Publisher
ieee
Conference_Titel
Power System Technology, 2004. PowerCon 2004. 2004 International Conference on
Print_ISBN
0-7803-8610-8
Type
conf
DOI
10.1109/ICPST.2004.1460308
Filename
1460308
Link To Document