• DocumentCode
    448683
  • Title

    Operations & safety assurance for section 2 of the CTRL

  • Author

    Watson, Keith

  • fYear
    2005
  • fDate
    10-11 Nov. 2005
  • Abstract
    The paper describes the principles and processes that have been used by Union Railways during the design and construction phases of the Channel Tunnel Rail Link to ensure compliance to European standards, and the safety and reliability of operation after commissioning.
  • Keywords
    construction industry; design engineering; railway safety; railways; reliability; standards; tunnels; CTRL Section 2; Channel Tunnel Rail Link; European standards compliance; Union Railways; operations & safety assurance; reliability;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Safety Assurance, 2005. The IEE Seminar on (Ref. No. 2005/11081)
  • Conference_Location
    IET
  • ISSN
    0537-9989
  • Print_ISBN
    0-86341-574-1
  • Type

    conf

  • Filename
    1575245