Refurbishment on Overhead Lines
Author
Ellam, Andrew
fYear
2006
fDate
27-27 March 2006
Firstpage
61
Lastpage
70
Abstract
This presentation aims to illustrate CE Electric UK´s approach to the refurbishment of overhead lines. It provides an overview of the end to end process followed to understand the future investment requirements of an aging overhead line asset base within a distribution network operator (DNO). It compares traditional and new overhead line inspection techniques used to gather asset condition information. The presentation demonstrates how CE Electric UK develops and justifies its investment decision making processes. It gives a real case study of one approach adopted for 132 kV tower lines, demonstrating the selection criteria and risk management techniques used to prioritise overhead lines for refurbishment.
Keywords
ageing; decision making; distribution networks; poles and towers; power overhead lines; risk management; CE Electric UKs approach; decision making processes; distribution network operator; overhead line inspection It techniques; overhead lines refurbishment; risk management techniques; tower lines; voltage 132 kV;
fLanguage
English
Publisher
iet
Conference_Titel
Managing the Complexity of an Aging Asset Base, 2006. The IEE Seminar on (Ref. No. 2006/11426)
Conference_Location
London
ISSN
0537-9989
Print_ISBN
0-86341-612-8
Type
conf
Filename
1632413
Link To Document