    453973
  • Title

    Refurbishment on Overhead Lines

  • Author

    Ellam, Andrew

  • fYear
    2006
  • fDate
    27-27 March 2006
  • Firstpage
    61
  • Lastpage
    70
  • Abstract
    This presentation aims to illustrate CE Electric UK´s approach to the refurbishment of overhead lines. It provides an overview of the end to end process followed to understand the future investment requirements of an aging overhead line asset base within a distribution network operator (DNO). It compares traditional and new overhead line inspection techniques used to gather asset condition information. The presentation demonstrates how CE Electric UK develops and justifies its investment decision making processes. It gives a real case study of one approach adopted for 132 kV tower lines, demonstrating the selection criteria and risk management techniques used to prioritise overhead lines for refurbishment.
  • Keywords
    ageing; decision making; distribution networks; poles and towers; power overhead lines; risk management; CE Electric UKs approach; decision making processes; distribution network operator; overhead line inspection It techniques; overhead lines refurbishment; risk management techniques; tower lines; voltage 132 kV;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Managing the Complexity of an Aging Asset Base, 2006. The IEE Seminar on (Ref. No. 2006/11426)
  • Conference_Location
    London
  • ISSN
    0537-9989
  • Print_ISBN
    0-86341-612-8
  • Type

    conf

  • Filename
    1632413