Abstract
The Sun never sets on modern major airports and in a 24 hour a day, 7 day a week business, extended outages, planned or unplanned, are extremely difficult to facilitate. Extended outages that shut down a major airport are the makings of front page newspaper articles. When the Seattle-Tacoma International Airport (Sea-Tac) decided to upgrade their electrical infrastructure, extensive studies were undertaken to determine the most reliable and cost effective power system available. The focus of this paper is to review the decisions concerning maintenance and the construction retrofit of one element in an airport´s power distribution system, the power center. This paper benefits maintenance directors, designers and others wishing to construct, in a remodel environment, with minimal impact to ongoing operations
Keywords
airports; distribution networks; Seattle-Tacoma International Airport; construction retrofit; power centers; power distribution system; Airports; Automatic control; Costs; Low voltage; Maintenance; Power distribution; Power engineering and energy; Power system reliability; Substations; Sun;
fLanguage
English
Publisher
ieee
Conference_Titel
Industry Applications Conference, 2006. 41st IAS Annual Meeting. Conference Record of the 2006 IEEE
Conference_Location
Tampa, FL
ISSN
0197-2618
Print_ISBN
1-4244-0364-2
Electronic_ISBN
0197-2618
Type
conf
DOI
10.1109/IAS.2006.256607
Filename
4025293
Link To Document