• DocumentCode
    459839
  • Title

    Retrofit of Power Centers Within an Airport

  • Author

    Guenther, D.S. ; Bergstrom, S.D.

  • Author_Institution
    CH2M Hill, Seattle, WA
  • Volume
    2
  • fYear
    2006
  • fDate
    8-12 Oct. 2006
  • Firstpage
    726
  • Lastpage
    732
  • Abstract
    The Sun never sets on modern major airports and in a 24 hour a day, 7 day a week business, extended outages, planned or unplanned, are extremely difficult to facilitate. Extended outages that shut down a major airport are the makings of front page newspaper articles. When the Seattle-Tacoma International Airport (Sea-Tac) decided to upgrade their electrical infrastructure, extensive studies were undertaken to determine the most reliable and cost effective power system available. The focus of this paper is to review the decisions concerning maintenance and the construction retrofit of one element in an airport´s power distribution system, the power center. This paper benefits maintenance directors, designers and others wishing to construct, in a remodel environment, with minimal impact to ongoing operations
  • Keywords
    airports; distribution networks; Seattle-Tacoma International Airport; construction retrofit; power centers; power distribution system; Airports; Automatic control; Costs; Low voltage; Maintenance; Power distribution; Power engineering and energy; Power system reliability; Substations; Sun;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industry Applications Conference, 2006. 41st IAS Annual Meeting. Conference Record of the 2006 IEEE
  • Conference_Location
    Tampa, FL
  • ISSN
    0197-2618
  • Print_ISBN
    1-4244-0364-2
  • Electronic_ISBN
    0197-2618
  • Type

    conf

  • DOI
    10.1109/IAS.2006.256607
  • Filename
    4025293