DocumentCode :
46444
Title :
Coordination of Hydro Units With Wind Power Generation Using Interval Optimization
Author :
Yangyang Liu ; Chuanwen Jiang ; Jingshuang Shen ; Jiakai Hu
Author_Institution :
Dept. of Electr. Eng., Shanghai Jiao Tong Univ., Shanghai, China
Volume :
6
Issue :
2
fYear :
2015
fDate :
Apr-15
Firstpage :
443
Lastpage :
453
Abstract :
The coordination of wind power and hydro power is an effective way for generating companies to enhance the ability of wind power dispatch and to avoid imbalance charges. However, specifying the probability distributions of random variables can be challenging for decision makers (DMs). This paper proposes a bidding strategy for wind farms and hydro stations in a generating company using interval optimization. Pessimistic preference ordering and DMs´ degrees of pessimism are also adopted in the optimization to compare interval numbers. Variations in wind power, the day-ahead energy price, and the intrahour energy price are then considered and represented by interval numbers instead of probability distributions. Compared with stochastic optimization, interval optimization does not need an exact probability distribution for the random variables. Moreover, it can reduce computational complexity as well as determine and optimize profit intervals, as illustrated in the numerical example presented herein.
Keywords :
hydroelectric power stations; optimisation; stochastic processes; wind power plants; bidding strategy; day-ahead energy price; hydro stations; hydro units coordination; interval optimization; pessimistic preference ordering; probability distributions; stochastic optimization; wind farms; wind power generation; Linear programming; Optimization; Probability distribution; Random variables; Uncertainty; Wind farms; Wind power generation; Hourly coordination; hydro power; interval optimization; price-based unit commitment (PBUC); wind power;
fLanguage :
English
Journal_Title :
Sustainable Energy, IEEE Transactions on
Publisher :
ieee
ISSN :
1949-3029
Type :
jour
DOI :
10.1109/TSTE.2014.2382122
Filename :
7029143
Link To Document :
بازگشت