DocumentCode :
465684
Title :
Research of Rrogram Process Time Post-evaluation Grey Critical Path Algorithm Method Based on Grey Data Advantage Relationship
Author :
Tang, Xuewen ; Liu, Sifeng ; Fang, ZhiGeng ; Mi, Chuanmin ; Guo, Xiaogang ; Qi, Zhirui
Author_Institution :
Nanjing Univ. of Aeronaut. & Astronaut., Nanjing
Volume :
1
fYear :
2006
fDate :
8-11 Oct. 2006
Firstpage :
455
Lastpage :
460
Abstract :
Program process time post-evaluation is a indeterminate grey information post-evaluation, the main aim of evaluation is test the validity of main event happened and the rationality of time-spending in the process of program implement. This paper researched the character of time process post-evaluation, clarified the data source of evaluation, constructed the grey critical paths (GCPM) basing on grey data advantage relationship, defined relative concept such as grey point´ work time parameter and grey critical path. Then designed step of evaluation and GCPM algorithm method.
Keywords :
critical path analysis; grey systems; grey critical path algorithm method; grey data advantage relationship; program process time post-evaluation; Algorithm design and analysis; Cities and towns; Cybernetics; Educational programs; Extraterrestrial measurements; Logic; Measurement standards; Stability analysis; System testing; Technological innovation;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Systems, Man and Cybernetics, 2006. SMC '06. IEEE International Conference on
Conference_Location :
Taipei
Print_ISBN :
1-4244-0099-6
Electronic_ISBN :
1-4244-0100-3
Type :
conf
DOI :
10.1109/ICSMC.2006.384425
Filename :
4273872
Link To Document :
بازگشت