Progress Report on the GCC Electricity Grid System Interconnection in the Middle East
Author
Al-Mohaisen, Adnan ; Chaussé, Luc ; Sud, Satish
Author_Institution
GCC Interconnection Authority, Dammam
fYear
2007
fDate
24-28 June 2007
Firstpage
1
Lastpage
7
Abstract
This paper describes the strategy adopted for implementation of the interconnection between the Gulf States (Kuwait, Saudi Arabia, Bahrain, Qatar, UAE and Oman) to ensure a competitive price for the project. This paper also describes the progress in the implementation and the issues which have had to be faced to date. In parallel, activities are being carried out to define the organizational structure of the GCCIA and the interconnection agreements which will provide the framework for the operations.
Keywords
power grids; power system interconnection; GCC electricity grid system interconnection; Middle East; interconnection implementation strategy; Contracts; Geographic Information Systems; HVDC transmission; Integrated circuit interconnections; Packaging; Power generation economics; Power grids; Power system interconnection; Substations; Underwater cables; 400 kV transmission; GIS substations; HVDC back-to-back converter; grid systems; interconnection; project financing; project implementation; submarine cable;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering Society General Meeting, 2007. IEEE
Conference_Location
Tampa, FL
ISSN
1932-5517
Print_ISBN
1-4244-1296-X
Electronic_ISBN
1932-5517
Type
conf
DOI
10.1109/PES.2007.385493
Filename
4275375
Link To Document