DocumentCode :
466592
Title :
An improved branch and bound algorithm for solving the identical parallel machnmes scheduling problem with family setup times
Author :
Bettayeb, B. ; Kacem, I. ; Adjallah, K.H.
Author_Institution :
ISTIT-OSI, Univ. de Technologie de Troyes
Volume :
1
fYear :
2006
fDate :
4-6 Oct. 2006
Firstpage :
1040
Lastpage :
1046
Abstract :
This article investigates identical parallel machines scheduling with family setups. The objective function is the sum of the weighted completion times. We propose an efficient constructive heuristic and three complementary lower bounding methods that we incorporate in a branch-and-bound algorithm. The results obtained by the above algorithm are satisfactory and encouraging
Keywords :
scheduling; tree searching; branch and bound algorithm; family setup times; identical parallel machines scheduling problem; lower bounding method; objective function; weighted completion time; Costs; Frequency; Job production systems; Job shop scheduling; Lagrangian functions; Noise measurement; Parallel machines; Processor scheduling; Scheduling algorithm; Systems engineering and theory; Branch and bound; Family setup times; Identical parallel machines; Scheduling;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Computational Engineering in Systems Applications, IMACS Multiconference on
Conference_Location :
Beijing
Print_ISBN :
7-302-13922-9
Electronic_ISBN :
7-900718-14-1
Type :
conf
DOI :
10.1109/CESA.2006.4281800
Filename :
4281800
Link To Document :
بازگشت