Title :
Safety Assurance of the East London Line Upgrade
Author_Institution :
London Overground SQE Manager, Transport for London
Abstract :
Project Context; ELLP system; Components and packages; V Lifecycle; Co-ordinating SQE; SQE Assurance; Assurance to whom; Technical Case.
Conference_Titel :
Safety Assurance, 2007 Institution of Engineering and Technology Seminar on
Conference_Location :
London, UK
Print_ISBN :
978-0-86341-869-3