DocumentCode :
468865
Title :
Rogs - a different approach to acceptance
Author :
Harman, Ian
Author_Institution :
Railway System Engineer, Network Rail
fYear :
2007
fDate :
7-8 Nov. 2007
Firstpage :
1
Lastpage :
21
Abstract :
. Under ROGS, Authorisation into use of non-Interoperable projects or equipment delegated to "Duty Holder" . Interoperable Projects continue to require authorisation from ORR (HMRI) . NR has established process for compliance with Regs through its "Network Rail Acceptance Panel", and delegated Systems Review Panels. . Network Rail policy to carry out Safet Verification of non-Interoperable projects using owvn staff (2nd Party approach) . More emphasis in NR on "end to end" safety assurance, and the duty of co-operation with others
fLanguage :
English
Publisher :
iet
Conference_Titel :
Safety Assurance, 2007 Institution of Engineering and Technology Seminar on
Conference_Location :
London, UK
ISSN :
0537-9989
Print_ISBN :
978-0-86341-869-3
Type :
conf
Filename :
4417104
Link To Document :
بازگشت