• DocumentCode
    477236
  • Title

    Design and first tests of five 100 GW Fast LTD cavities driving an e-beam diode load

  • Author

    Kim, A. ; Sinebryukhov, V. ; Kovalchuk, B. ; Bastrikov, A. ; Durakov, V. ; Volkov, S. ; Frolov, S. ; Alexeenko, V. ; Mazarakis, M. ; McDaniel, D. ; Olson, C. ; Struve, K. ; Gilgenbach, R.

  • Author_Institution
    Institute of High Current Electronics , Academichesky Ave. 2/3, 634055 Tomsk, Russia
  • Volume
    1
  • fYear
    2007
  • fDate
    17-22 June 2007
  • Firstpage
    144
  • Lastpage
    147
  • Abstract
    A module consisting of five 100 GW Fast LTD cavities stacked in series was tested with e-beam diode load to study how a number of cavities behave and add their energy, power and voltage output in a voltage adder configuration assembly. In this report we present the design of the module and diode, and compare test results with simulations.
  • Keywords
    Cathodes; Current measurement; Diodes; Electrodes; Electron emission; Electronic equipment testing; Inductance measurement; Insulation; Laboratories; Voltage;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Pulsed Power Conference, 2007 16th IEEE International
  • Conference_Location
    Albuquerque, NM
  • Print_ISBN
    978-1-4244-0913-6
  • Electronic_ISBN
    978-1-4244-0914-3
  • Type

    conf

  • DOI
    10.1109/PPPS.2007.4651809
  • Filename
    4651809