DocumentCode :
477846
Title :
Evaluating Degree of Success in Power Plant Construction Project Based on Fuzzy Neural Network
Author :
Huang, Yuansheng ; Liu, Qingchao ; Qiu, Zilong ; Wang, Mingyan
Author_Institution :
Dept. of Econ. & Manage., North China Electr. Power Univ., Baoding
Volume :
3
fYear :
2008
fDate :
18-20 Oct. 2008
Firstpage :
206
Lastpage :
210
Abstract :
Using fuzzy neural network to evaluate the degree of success in power plant is this paper´s innovative points. First we give an index system, and then use the relative membership degree processing the date, which as the input sample of neural network. Then use PSO algorithm optimizes the BP neural network algorithm. Use this improved BP neural network to evaluate. It is more accuracy and speedily than BP neural network algorithm. Lastly, we can get a satisfaction result. This can be guiding the project construction.
Keywords :
backpropagation; fuzzy neural nets; fuzzy set theory; power engineering computing; power plants; backpropagation neural networks; fuzzy neural network; particle swarm optimisation; power plant construction project; relative membership degree processing; Clustering algorithms; Conference management; Feedforward neural networks; Fuzzy neural networks; Fuzzy systems; Investments; Neural networks; Neurons; Power generation; Project management; PSO; evaluating degree of success; neural network; power plant construction project;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Fuzzy Systems and Knowledge Discovery, 2008. FSKD '08. Fifth International Conference on
Conference_Location :
Shandong
Print_ISBN :
978-0-7695-3305-6
Type :
conf
DOI :
10.1109/FSKD.2008.69
Filename :
4666241
Link To Document :
بازگشت