DocumentCode
478815
Title
Hill Climbing-Based Decentralized Job Scheduling on Computational Grids
Author
Wang, Qingjiang ; Gao, Yun ; Liu, Peishun
Author_Institution
Dept. of Comput. Sci., Ocean Univ. of China, Qingdao
Volume
1
fYear
2006
fDate
20-24 June 2006
Firstpage
705
Lastpage
708
Abstract
De-centralized job scheduling is implemented by job migrations between neighboring grid nodes. To optimize node selection of a new-submitted job, the job may be migrated many times. Here, the hill climbing method is used to determine the migration route. Experiments simulate de-centralized job scheduling, including node adjacencies, local scheduling of grid nodes, and grid workload. Compared with k-distributed and auction methods, hill climbing-based scheduling usually can enhance processor utilization, and can reduce bounded slowdown
Keywords
grid computing; processor scheduling; resource allocation; auction method; computational grid; decentralized job scheduling; grid workload; hill climbing; k-distributed method; processor utilization; Aggregates; Computational modeling; Computer science; Grid computing; Large-scale systems; Oceans; Processor scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
Computer and Computational Sciences, 2006. IMSCCS '06. First International Multi-Symposiums on
Conference_Location
Hanzhou, Zhejiang
Print_ISBN
0-7695-2581-4
Type
conf
DOI
10.1109/IMSCCS.2006.75
Filename
4673630
Link To Document