DocumentCode :
478949
Title :
Agent Risk Evaluation in Agent-Construction System Based on Analytic Hierarchy Process
Author :
Chen, Jingru ; Zheng, Shaoying ; Yang, Shujuan ; Liang, Zhenhui
Author_Institution :
Sch. of Civil Eng., Qingdao Technol. Univ., Qingdao
fYear :
2008
fDate :
12-14 Oct. 2008
Firstpage :
1
Lastpage :
4
Abstract :
As one of the significant reform methods to improve the management level of government investment project, agent-construction system has been applied in many places. During the process of agent construction, agent assumes considerable risk. This paper identifies the main risks of agent. Based on the analytic hierarchy process method, the main risk and relative influence factors are analyzed and evaluated. The importance degree order of main risks and relative influence factors are put forward. The research of this paper can be referred by risk management engineers in agent-construction projects.
Keywords :
investment; project management; risk analysis; agent construction; agent risk evaluation; agent- construction system; agent-construction system; analytic hierarchy process; government investment project management level; Civil engineering; Contracts; Engineering management; Government; Interference; Investments; Project management; Risk analysis; Risk management; Technology management;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Wireless Communications, Networking and Mobile Computing, 2008. WiCOM '08. 4th International Conference on
Conference_Location :
Dalian
Print_ISBN :
978-1-4244-2107-7
Electronic_ISBN :
978-1-4244-2108-4
Type :
conf
DOI :
10.1109/WiCom.2008.2493
Filename :
4680682
Link To Document :
بازگشت