DocumentCode
479338
Title
A New Method for Generating Work Breakdown Structure on Aircraft Assembly Scheduling
Author
Jie Zhang ; Yuan Li ; Jian-Feng Yu ; Kai-Fu Zhang
Author_Institution
Key Lab. of Contemporary Design & Integrated Manuf. Technol., Northwestern Polytech. Univ., Xi´an
fYear
2008
fDate
12-14 Oct. 2008
Firstpage
1
Lastpage
4
Abstract
Based on assembly order, a new method for generating work breakdown structure was proposed on aircraft assembly scheduling, which can effectively improve fine control ability of assembly workshop. In the method, firstly, a three-layer unit partition model of assembly operation was established referring to the existing unit partition in assembly workshop, which refined foundation for assembly field control. Secondly, through information mapping rules between WBS and AO, assembly process information had been conveniently utilized in building assembly scheduling. Finally the WBS generating method for outline tasks and node tasks were found by assembly operation model and information mapping rules. In addition, the implemental technique and the application of the aircraft assembly field were introduced, and the result demonstrated the functionality of the method.
Keywords
aerospace industry; aircraft; assembling; scheduling; aircraft assembly scheduling; assembly workshop; information mapping rules; three-layer unit partition model; work breakdown structure; Aerospace control; Aircraft manufacture; Assembly systems; Educational technology; Electric breakdown; Job shop scheduling; Laboratories; Management information systems; Manufacturing; Technology management;
fLanguage
English
Publisher
ieee
Conference_Titel
Wireless Communications, Networking and Mobile Computing, 2008. WiCOM '08. 4th International Conference on
Conference_Location
Dalian
Print_ISBN
978-1-4244-2107-7
Electronic_ISBN
978-1-4244-2108-4
Type
conf
DOI
10.1109/WiCom.2008.3027
Filename
4681216
Link To Document