DocumentCode
479564
Title
The process modeling of creating work breakdown structures of automobile R&D project based on PDCA
Author
Yang, Ying ; Yu, Bengong ; Ma, Xijun
Author_Institution
Sch. of Manage., Hefei Univ. of Technol., Hefei
Volume
1
fYear
2008
fDate
12-15 Oct. 2008
Firstpage
326
Lastpage
330
Abstract
Work breakdown structures are the base for project management. The quality of work breakdown structures of automobile R&D project directly affects the control of the process of automobile new product development in time, cost, scope, quality and other aspects. In order to improve the quality of work breakdown structures, the paper introduces Plan-Do-Check-Action cycle and develops a distinct process model by integrating the objective management and process management. The model contains four key indicators, such as scope, awareness, responsibility and risk, to evaluate the quality of work breakdown structures in the process. The paper also presents specific tools and methods to the implementation of the model with example.
Keywords
automobiles; product development; project management; quality management; research and development; automobile R&D project; plan-do-check-action cycle; product development; project management; quality management; work breakdown structures; Automobiles; Costs; Electric breakdown; Packaging; Process control; Product development; Project management; Quality management; Research and development; Scheduling; PDCA; auomobile R&D project; creating; quality; work breakdown structures;
fLanguage
English
Publisher
ieee
Conference_Titel
Service Operations and Logistics, and Informatics, 2008. IEEE/SOLI 2008. IEEE International Conference on
Conference_Location
Beijing
Print_ISBN
978-1-4244-2012-4
Electronic_ISBN
978-1-4244-2013-1
Type
conf
DOI
10.1109/SOLI.2008.4686414
Filename
4686414
Link To Document