• DocumentCode
    479564
  • Title

    The process modeling of creating work breakdown structures of automobile R&D project based on PDCA

  • Author

    Yang, Ying ; Yu, Bengong ; Ma, Xijun

  • Author_Institution
    Sch. of Manage., Hefei Univ. of Technol., Hefei
  • Volume
    1
  • fYear
    2008
  • fDate
    12-15 Oct. 2008
  • Firstpage
    326
  • Lastpage
    330
  • Abstract
    Work breakdown structures are the base for project management. The quality of work breakdown structures of automobile R&D project directly affects the control of the process of automobile new product development in time, cost, scope, quality and other aspects. In order to improve the quality of work breakdown structures, the paper introduces Plan-Do-Check-Action cycle and develops a distinct process model by integrating the objective management and process management. The model contains four key indicators, such as scope, awareness, responsibility and risk, to evaluate the quality of work breakdown structures in the process. The paper also presents specific tools and methods to the implementation of the model with example.
  • Keywords
    automobiles; product development; project management; quality management; research and development; automobile R&D project; plan-do-check-action cycle; product development; project management; quality management; work breakdown structures; Automobiles; Costs; Electric breakdown; Packaging; Process control; Product development; Project management; Quality management; Research and development; Scheduling; PDCA; auomobile R&D project; creating; quality; work breakdown structures;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Service Operations and Logistics, and Informatics, 2008. IEEE/SOLI 2008. IEEE International Conference on
  • Conference_Location
    Beijing
  • Print_ISBN
    978-1-4244-2012-4
  • Electronic_ISBN
    978-1-4244-2013-1
  • Type

    conf

  • DOI
    10.1109/SOLI.2008.4686414
  • Filename
    4686414