DocumentCode :
479700
Title :
Research on formation mechanism of X Party Material Flow: Rebuilding of PMF primitive
Author :
Hou, Hanping ; Xu, Shoubo
Author_Institution :
Sch. of Econ. & Manage., Beijing Jiaotong Univ., Beijing
Volume :
1
fYear :
2008
fDate :
12-15 Oct. 2008
Firstpage :
1231
Lastpage :
1236
Abstract :
The Material flow model taking enterprise or strategy business unit (SBU) as a whole for division of work and cooperation, in nature, is a second-best combination of the capability factors of material flow. By making full use of modern information technology and science progress, the division of work in material flow shall be detailed to the level of PMF primitive, for the purpose of the cross-organization and cross-industry rebuilding and optimizing, and a new model of material organizing - X Party Material Flow (X-PMF) was formed thereby, which will minimize the cost of production and transaction, and increase the comprehensive efficiency of the material flow of supply chain.
Keywords :
cost reduction; minimisation; supply chains; PMF primitive rebuilding; X party material flow; logistics; material flow formation mechanism; material organizing; production cost minimization; supply chain; Cost function; Flow production systems; Information technology; Logistics; Material storage; Optimized production technology; Procurement; Scattering; Supply chains; Transportation; Logistics; Material Flow (MF); X Party Material Flow (XPMF);
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Service Operations and Logistics, and Informatics, 2008. IEEE/SOLI 2008. IEEE International Conference on
Conference_Location :
Beijing
Print_ISBN :
978-1-4244-2012-4
Electronic_ISBN :
978-1-4244-2013-1
Type :
conf
DOI :
10.1109/SOLI.2008.4686587
Filename :
4686587
Link To Document :
بازگشت