Robustness in Resource Constrained Project Scheduling
Author
Cui, Wanan ; Yao, ShengBao ; Wang, Xianjia ; Wang, Qianzhen
Author_Institution
Postdoctoral Station, Wuhan Univ., Wuhan, China
Volume
5
fYear
2008
fDate
12-14 Dec. 2008
Firstpage
984
Lastpage
987
Abstract
This paper analyses problems in robust measurement for resource constrained project. Then, project makespan and the total number of critical sequences as objective functions to be optimized is proposed to determine the right-justified baseline schedule. On the basis of this baseline schedule, the indices of quality robustness and solution robustness are defined. Examples show that the methods proposed in this paper are better than what proposed by Kobylanski and Kuchta.
Keywords
optimisation; project management; resource allocation; scheduling; stability; optimization; resource constrained project scheduling; robustness; Computer science; Conference management; Educational institutions; Engineering management; Processor scheduling; Project management; Resource management; Robustness; Software engineering; Software measurement; project scheduling; resource-constrained; robustness;
fLanguage
English
Publisher
ieee
Conference_Titel
Computer Science and Software Engineering, 2008 International Conference on
Conference_Location
Wuhan, Hubei
Print_ISBN
978-0-7695-3336-0
Type
conf
DOI
10.1109/CSSE.2008.1477
Filename
4723069
Link To Document