DocumentCode :
480457
Title :
Links Analysis in Resource Constrained Projects
Author :
Cui, Wanan ; Yao, ShengBao ; Cao, Xiuning
Volume :
5
fYear :
2008
fDate :
12-14 Dec. 2008
Firstpage :
988
Lastpage :
991
Abstract :
This paper analyses the problems in establishing resource links between activities of former researchers¿ work. And then, we give the intuitive meanings and strict definition of the concept of minimal feasible set (MFS). As a result, we gain several theorems from MFS. Precedence relations between activities can be identified by these theorems.
Keywords :
scheduling; set theory; links analysis; minimal feasible set; precedence relations; resource constrained projects; Availability; Clouds; Computer science; Conference management; Educational institutions; Engineering management; Processor scheduling; Project management; Resource management; Software engineering; minimal feasible sets; precedence relations; project schedule; resource constraints; resource links;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Computer Science and Software Engineering, 2008 International Conference on
Conference_Location :
Wuhan, Hubei
Print_ISBN :
978-0-7695-3336-0
Type :
conf
DOI :
10.1109/CSSE.2008.1478
Filename :
4723070
Link To Document :
بازگشت