DocumentCode :
481341
Title :
New lower bound for single machine total tardiness problem with sequence dependent setup
Author :
Luo, Xiaochuan ; Li, Dancheng ; Song, Hang ; Cui, Dongliang
Author_Institution :
Key Laboratory of Process Industry Automation of MOE, Northeastern University, Shenyang 110004, China
fYear :
2006
fDate :
6-7 Nov. 2006
Firstpage :
1455
Lastpage :
1458
Abstract :
A new Lower bound is present for the NP-hard problem of scheduling N jobs on a single machine with due dates, sequence-dependent setup times, and no preemption where the objective is to minimize the total tardiness. One branch-and-bound algorithm with the new lower bound is developed to demonstrate the effectiveness of lower bound. A comparison with Ragatz’s B&B approaches indicates that the lower bound is competitive.
Keywords :
Lower bound; branch and bound; sequence-dependent setup; single machine schedule; total tardiness;
fLanguage :
English
Publisher :
iet
Conference_Titel :
Technology and Innovation Conference, 2006. ITIC 2006. International
Conference_Location :
Hangzhou
ISSN :
0537-9989
Print_ISBN :