DocumentCode
490829
Title
AC Power Plant Modernisation in British Telecom
Author
Nightingale, C R
Author_Institution
M.I.E.E., M.I.E.R.E, British Telcommunications, Power & Building Services Division, Leith House, 47/57 Gresham Street, London, EC2V 7JL.
fYear
1985
fDate
14-17 Oct. 1985
Firstpage
179
Lastpage
185
Abstract
British Telecom has installed some 4,500 Standby Diesel Generator Sets in its telephone exchanges, radio, and repeater stations over the past 25 years. Given the changing pattern of equipment technology from analogue to digital systems, particularly in major centres, and the increasing penetration of AC operated computer based plant, a review has been completed of the power systems needed now and in the future. A study has also been undertaken of AC power and total system reliability. This paper outlines the areas of investigation and shows how enhanced plant reliability targets are being achieved, and maintenance problems reduced.
Keywords
Diesel engines; Digital systems; Maintenance; Power generation; Power system reliability; Rectifiers; Standby generators; Switches; Telecommunications; Telephony;
fLanguage
English
Publisher
ieee
Conference_Titel
Telecommunications Energy Conference, 1985. INTELEC '85. Seventh International
Conference_Location
Munich, Federal Republic of Germany
Print_ISBN
3-8007-1429-9
Type
conf
Filename
4794222
Link To Document