• DocumentCode
    490829
  • Title

    AC Power Plant Modernisation in British Telecom

  • Author

    Nightingale, C R

  • Author_Institution
    M.I.E.E., M.I.E.R.E, British Telcommunications, Power & Building Services Division, Leith House, 47/57 Gresham Street, London, EC2V 7JL.
  • fYear
    1985
  • fDate
    14-17 Oct. 1985
  • Firstpage
    179
  • Lastpage
    185
  • Abstract
    British Telecom has installed some 4,500 Standby Diesel Generator Sets in its telephone exchanges, radio, and repeater stations over the past 25 years. Given the changing pattern of equipment technology from analogue to digital systems, particularly in major centres, and the increasing penetration of AC operated computer based plant, a review has been completed of the power systems needed now and in the future. A study has also been undertaken of AC power and total system reliability. This paper outlines the areas of investigation and shows how enhanced plant reliability targets are being achieved, and maintenance problems reduced.
  • Keywords
    Diesel engines; Digital systems; Maintenance; Power generation; Power system reliability; Rectifiers; Standby generators; Switches; Telecommunications; Telephony;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Telecommunications Energy Conference, 1985. INTELEC '85. Seventh International
  • Conference_Location
    Munich, Federal Republic of Germany
  • Print_ISBN
    3-8007-1429-9
  • Type

    conf

  • Filename
    4794222