DocumentCode
493178
Title
Risk Based Decision for Reinvestments in Distribution Systems
Author
Istad, M.K. ; Nordgard, Dag Eirik ; Gjerde, O. ; Catrinu, M.D. ; Nybø, A. ; Birkeland, B.E.
Author_Institution
SINTEF Energy Res., Trondheim
fYear
2008
fDate
25-29 May 2008
Firstpage
1
Lastpage
7
Abstract
This paper illustrates the challenges associated with risk assessment for reinvestments decisions. A holistic framework for risk assessment in electricity distribution systems will be described first and then used to structure the analysis and decision making in a case study concerning cable reinvestment. These decisions are generally multi criteria decisions, including risks related to e.g.; economy, environment, reputation, safety and quality of supply. The paper describes the use of different types of decision support tools used to aid reinvestment decision making in electricity distribution systems, with emphasis on multi criteria decision analysis (MCDA).
Keywords
decision making; investment; power distribution economics; risk management; electricity distribution system; multicriteria decision analysis; reinvestment; risk based decision making; Asset management; Costs; Decision making; Electricity supply industry deregulation; IEC standards; ISO; Risk analysis; Risk management; Safety; Terminology;
fLanguage
English
Publisher
ieee
Conference_Titel
Probabilistic Methods Applied to Power Systems, 2008. PMAPS '08. Proceedings of the 10th International Conference on
Conference_Location
Rincon
Print_ISBN
978-1-9343-2521-6
Electronic_ISBN
978-1-9343-2540-7
Type
conf
Filename
4912616
Link To Document