  • Abstract
    The Brazilian power grid has traditionally been designed and operated by means of a deterministic reliability criteria set. Although these criteria have successfully eliminated system constraints, they have also entailed higher costs, especially those concerning operation planning. That happens because such deterministic criteria allow quantitative and not- qualitative analysis. Their essential weakness is that they cannot recognize the probabilistic or stochastic nature of system behavior, of customers demands, or of a component failures. This article illustrates how probabilistic criteria can replace the existing deterministic approach. Detailed reliability analyses of different load levels in the electric power system of Parana state, Brazil, are used as case study. The proposed approach seems promising in terms of reducing the cost for operation and long-term planning. On the other hand, the system risk level will not experience any significant increase.
  • Keywords
    power grids; power system reliability; deterministic reliability criteria set; electric power system; expansion; operation planning; power grid; probabilistic criterion; system constraints; Costs; Delay; ISO; Power grids; Power system planning; Power system reliability; Power transmission lines; Stochastic systems; Substations; Thermal loading;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Probabilistic Methods Applied to Power Systems, 2008. PMAPS '08. Proceedings of the 10th International Conference on
  • Conference_Location
    Rincon
  • Print_ISBN
    978-1-9343-2521-6
  • Electronic_ISBN
    978-1-9343-2540-7
  • Type

    conf

  • Filename
    4912684