DocumentCode :
494941
Title :
Electrical installation on FPSO´s — basic rules
Author :
Tastet, Jacques ; Marchais, Sylvain ; Angays, P.
Author_Institution :
TECHNIP, Paris, France
fYear :
2009
fDate :
26-28 May 2009
Firstpage :
44
Lastpage :
49
Abstract :
Floating Production Storage and Off-loading facilities (called FPSO in this paper) have become in a recent past a key-player in the recovery of Oil & Gas from deep sea wells. This paper intends to describe the engineering design drivers specifically applying for the installation of electrical equipment and materials on FPSO´s. Most of the rules, which will be developed below, could be extended to installations on an off-shore platform.
Keywords :
installation; offshore installations; petroleum industry; deep sea well; electrical installation; floating production storage; gas recovery; off shore platform; off-loading facilities; oil recovery; Automatic control; Control systems; Design engineering; Electrical safety; Fires; Petroleum; Product safety; Production; Safety devices; Substations; ENMCS: Electrical Network Monitoring and Control System; FPSO: Floating Production Storage and Off-loading facilities; MCT: multi-cable transit (cable entry in safe areas); VSDS: Variable Speed Drive System;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
PCIC Europe, 2009. PCIC EUROPE '09. Conference Record
Conference_Location :
Barcelona
Print_ISBN :
978-1-4244-3975-1
Electronic_ISBN :
978-3-9523-3334-1
Type :
conf
Filename :
5164865
Link To Document :
بازگشت