DocumentCode :
498363
Title :
Preliminary Study of the Systematic Management of Project Claim
Author :
Yun, Liu ; Wei, Xu ; Jiong, Tang ; Xin, Liu ; Ruijun, Jin
Author_Institution :
Dept. of Building Eng., Tongji Univ., Shanghai, China
Volume :
2
fYear :
2009
fDate :
19-21 May 2009
Firstpage :
572
Lastpage :
576
Abstract :
With the lower profit of construction enterprises these years, that low bid and high claim has been an important means for the construction enterprises to exist and develop, which is an effect approach to make profit maximization. In this paper, the cause, the responsibility and the evidence of the claim events were classified, wit Visual Basic 6.0, PHP and Microsoft SQL Server 2000 that are used to establish the system of systematic management of project claim, which could help construction enterprises systematic management. So they can claim in time and veraciously, maintenance the profit of themselves.
Keywords :
Visual BASIC; construction industry; profitability; Microsoft SQL Server 2000; PHP; Visual Basic 6.0; construction enterprise; profit maximization; project claim systematic management; Buildings; Contracts; Costs; Engineering management; Finishing; Information technology; Intelligent structures; Intelligent systems; Project management; Visual BASIC; Altering; Claim; Information; evidence; record;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Intelligent Systems, 2009. GCIS '09. WRI Global Congress on
Conference_Location :
Xiamen
Print_ISBN :
978-0-7695-3571-5
Type :
conf
DOI :
10.1109/GCIS.2009.392
Filename :
5209357
Link To Document :
بازگشت