DocumentCode
498668
Title
Overhead Line Equipment design and pantograph interface
Author
Warburton, Keith
Author_Institution
Balfour Beatty Rail, UK
fYear
2009
fDate
1-5 June 2009
Firstpage
127
Lastpage
133
Abstract
The key function of a railway overhead line equipment (OLE) is to supply power to electric traction units. This transfer takes places at the moving interface between the OLE and pantograph and it is the primary function of the designers to ensure the fundamental compatibility of these two systems, and that optimum performance is achieved over a range of weather, speed and maintenance conditions. This paper describes the fundamental technical issues affecting this interface performance.
Keywords
pantographs; power overhead lines; railways; traction; electric traction units; maintenance conditions; pantograph interface; railway overhead line equipment; speed conditions;
fLanguage
English
Publisher
iet
Conference_Titel
Railway Electrification Infrastructure and Systems, 2009. REIS 2009. 4th IET professional Development Course on
Conference_Location
London
ISSN
0537-9989
Print_ISBN
978-1-84919-133-3
Type
conf
Filename
5211328
Link To Document