DocumentCode
499044
Title
Bicriteria parallel machines scheduling problem with fuzzy due dates based on NPGA
Author
Yuan, Xie ; Ou, Linlin
Author_Institution
Sch. of Electr., Shanghai Dianji Univ., Shanghai, China
Volume
1
fYear
2009
fDate
12-15 July 2009
Firstpage
597
Lastpage
601
Abstract
A kind of unrelated parallel machines scheduling problem with fuzzy due dates was discussed. The memberships of fuzzy due dates denoted the grades of satisfaction of decision-maker with respect to completion times with jobs. Objectives of scheduling is to maximize the minimum grade of satisfaction while makespan is minimized in the meantime. Niched Pareto genetic algorithm (NPGA) was employed to search the Pareto optimal solution sets for above bicriteria scheduling problem. Numerical simulation illustrates that ability of NPGA to find and maintain Pareto optimal solutions set in population.
Keywords
Pareto optimisation; computational complexity; fuzzy set theory; genetic algorithms; scheduling; Pareto optimal solution sets; bicriteria parallel machines scheduling problem; decision-maker satisfaction; fuzzy due dates; niched Pareto genetic algorithm; Cybernetics; Machine learning; Parallel machines; Pareto optimal; bicriteria; fuzzy due dates; genetic algorithm; parallel machines scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
Machine Learning and Cybernetics, 2009 International Conference on
Conference_Location
Baoding
Print_ISBN
978-1-4244-3702-3
Electronic_ISBN
978-1-4244-3703-0
Type
conf
DOI
10.1109/ICMLC.2009.5212516
Filename
5212516
Link To Document