• DocumentCode
    499044
  • Title

    Bicriteria parallel machines scheduling problem with fuzzy due dates based on NPGA

  • Author

    Yuan, Xie ; Ou, Linlin

  • Author_Institution
    Sch. of Electr., Shanghai Dianji Univ., Shanghai, China
  • Volume
    1
  • fYear
    2009
  • fDate
    12-15 July 2009
  • Firstpage
    597
  • Lastpage
    601
  • Abstract
    A kind of unrelated parallel machines scheduling problem with fuzzy due dates was discussed. The memberships of fuzzy due dates denoted the grades of satisfaction of decision-maker with respect to completion times with jobs. Objectives of scheduling is to maximize the minimum grade of satisfaction while makespan is minimized in the meantime. Niched Pareto genetic algorithm (NPGA) was employed to search the Pareto optimal solution sets for above bicriteria scheduling problem. Numerical simulation illustrates that ability of NPGA to find and maintain Pareto optimal solutions set in population.
  • Keywords
    Pareto optimisation; computational complexity; fuzzy set theory; genetic algorithms; scheduling; Pareto optimal solution sets; bicriteria parallel machines scheduling problem; decision-maker satisfaction; fuzzy due dates; niched Pareto genetic algorithm; Cybernetics; Machine learning; Parallel machines; Pareto optimal; bicriteria; fuzzy due dates; genetic algorithm; parallel machines scheduling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Machine Learning and Cybernetics, 2009 International Conference on
  • Conference_Location
    Baoding
  • Print_ISBN
    978-1-4244-3702-3
  • Electronic_ISBN
    978-1-4244-3703-0
  • Type

    conf

  • DOI
    10.1109/ICMLC.2009.5212516
  • Filename
    5212516