Integrated solution to target MV cable replacement
Author :
Chabod, Eleonore ; Dorison, Eric ; Espilit, Thierry ; Michel, Matthieu
Author_Institution :
EDF R&D - France
fYear :
2009
fDate :
8-11 June 2009
Firstpage :
1
Lastpage :
4
Abstract :
The majority of distribution electricity networks were significantly developed in the 60´s and 70´s, requiring the installation of large amounts of MV cables during this period of time. The design life of cables is believed to be around 40-50 years even if most cables are proving to last significantly longer. As the condition of this underground asset is degrading, the utilities will see the investment level required increase in the coming years.
fLanguage :
English
Publisher :
iet
Conference_Titel :
Electricity Distribution - Part 1, 2009. CIRED 2009. 20th International Conference and Exhibition on
Conference_Location :
Prague, Czech Republic
ISSN :
0537-9989
Print_ISBN :
978-1-84919126-5
Type :
conf
Filename :
5255336
Link To Document :
بازگشت