• DocumentCode
    502025
  • Title

    New technological challenges operating the 110 kV, 16.7 Hz grid for railway power supply in Germany

  • Author

    Weiland, Kristian

  • Author_Institution
    DB Energie GmbH - Germany
  • fYear
    2009
  • fDate
    8-11 June 2009
  • Firstpage
    1
  • Lastpage
    3
  • Abstract
    The liberalization of the energy and railway sector changed regulatory and economic boundaries, and posed new requirements for the topology and the operation of the 110 kV grid supplying the German railway system. Procurement of traction energy had to comply with the rules of regulated energy markets. Technical facilities are linked to the EEX markets for peak power, and thus require highly efficient and dependable connections to the public grid. The ongoing consolidation within supplier markets for technical components stipulates the use of standardized components in generation and transmission. The advances in power electronics and modern control systems open a way to utilize the opportunities of our present economic environment. State-of-the-art static converter stations, highly integrated control technology, and station automation tailored to railway needs facilitate an attractive access to the energy markets for railway systems.
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Electricity Distribution - Part 1, 2009. CIRED 2009. 20th International Conference and Exhibition on
  • Conference_Location
    Prague, Czech Republic
  • ISSN
    0537-9989
  • Print_ISBN
    978-1-84919126-5
  • Type

    conf

  • Filename
    5255416