Abstract :
In this paper the author details how ESB Networks carried out a fundamental re-examination of it´s housing scheme design criteria, developed new design procedures, matched these to the range of network components purchased and retrained Design staff in the new approach. New housing scheme design achieve greater standardisation of the equipment required, more intensive use of assets and a more flexible network design with lower losses, better voltage regulation and improved reliability