DocumentCode
502370
Title
Integration of DG in MV-grids: Challenges encountered by the grid operator
Author
Coster, Edward ; Van Houwelingen, Dik
Author_Institution
Stedin - the Netherlands
fYear
2009
fDate
8-11 June 2009
Firstpage
1
Lastpage
4
Abstract
In the Netherlands horticultural areas are developed and in these areas a large number of CHP-plants are installed or will be installed in the near future. To facilitate all possible expected power flows the distribution grid as well as the transmission grid needs reinforcements. To meet the obligations of the legal and regulatory framework the grid planning has to be done in a proactive way. In this paper grid planning of a medium voltage grid including large penetration of CHP-plants is described. It is illustrated with an existing case study.
fLanguage
English
Publisher
iet
Conference_Titel
Electricity Distribution - Part 1, 2009. CIRED 2009. 20th International Conference and Exhibition on
Conference_Location
Prague, Czech Republic
ISSN
0537-9989
Print_ISBN
978-1-84919126-5
Type
conf
Filename
5255782
Link To Document