DocumentCode
502711
Title
A single machine preemptive scheduling problem with arbitrary release dates and fuzzy due dates
Author
Yuan, Xie ; Ou, Linlin
Author_Institution
Sch. of Electr., Shanghai Dianji Univ., Shanghai, China
Volume
2
fYear
2009
fDate
8-9 Aug. 2009
Firstpage
474
Lastpage
477
Abstract
Preemptive scheduling problem of a single machine subject to arbitrary release dates under uncertain situation is discussed. The release dates of jobs are independence and different with each other. Uncertainty means due dates are not accurate, which can be described by fuzzy set. The memberships of fuzzy due dates denote grade of satisfaction of completion times of corresponding jobs. The objective of the problem is to find an optimal schedule which maximizes the minimal grade of satisfaction of jobs completion times with respect to fuzzy due dates. By extending the method of corresponding problem with accurate due dates into fuzzy situation for the problem, an O(n2) algorithm is presented.
Keywords
computational complexity; fuzzy set theory; minimisation; single machine scheduling; arbitrary release date; fuzzy due date; fuzzy set; jobs completion time; minimum satisfaction degree maximisation; optimal schedule; single machine preemptive scheduling problem; uncertain situation; Automation; Communication system control; Delay; Fuzzy control; Fuzzy sets; Job shop scheduling; Optimal scheduling; Processor scheduling; Single machine scheduling; Uncertainty; fuzzy due dates; preemption; release times; single machine;
fLanguage
English
Publisher
ieee
Conference_Titel
Computing, Communication, Control, and Management, 2009. CCCM 2009. ISECS International Colloquium on
Conference_Location
Sanya
Print_ISBN
978-1-4244-4247-8
Type
conf
DOI
10.1109/CCCM.2009.5267472
Filename
5267472
Link To Document