DocumentCode :
502791
Title :
The multi-technics projects optimization of interim production based on the group decision criteria strategy
Author :
ZhenQing, Miao
Author_Institution :
Zhongyuan Univ. of Technol., Zhengzhou, China
Volume :
2
fYear :
2009
fDate :
8-9 Aug. 2009
Firstpage :
331
Lastpage :
333
Abstract :
Aiming at the industrial product process constituted by multi-techniques and multi-branch, the best producing technics project is achieved by the judge method that is combined by colony unanimous rule with avail-maximizing rule among multi-branch. The block´s electricity-installing in shipbuilding is chosen to be optimized, by the sample, it avoids the optimizing of multifarious maths and the preferences in multi-phases. the method is effective to support multi-technics projects´ decision-making in the actual produce and management.
Keywords :
group decision support systems; production engineering computing; production management; shipbuilding industry; Interim production; colony unanimous rule; group decision criteria strategy; industrial product process; multitechnics project decision-making; multitechnics projects optimization; shipbuilding; Arithmetic; Buildings; Communication industry; Communication system control; Decision making; Energy management; Optimization methods; Optimized production technology; Project management; Technology management; colony; management; optimization; produce; technics;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Computing, Communication, Control, and Management, 2009. CCCM 2009. ISECS International Colloquium on
Conference_Location :
Sanya
Print_ISBN :
978-1-4244-4247-8
Type :
conf
DOI :
10.1109/CCCM.2009.5267933
Filename :
5267933
Link To Document :
بازگشت