Title :
Practices of Extreme Programming for ERP Based on Two-dimensional Dynamic Time Scheduling Interface Method
Author :
Zeng Min ; Wang Cheng ; Long Qiao-yun
Author_Institution :
Simulation Center of Hydropower & Digital Eng., Huazhong Univ. of Sci. & Technol., Wuhan, China
Abstract :
Traditional ERP software displays less information on a single interface and fails to show the time related statistical information directly and thus has various types of defects. A two-dimensional time dynamic scheduling interface methods is put forward. This interface shows the time-related statistics information using array of various components from dynamically generated three or more regions, task scheduling or time scheduling is direct-viewing and is convenient, and users are allowed to see more needed comprehensive statistics and time-scheduled information. By using the agile extreme programming model (extreme programming model), a number of small and medium enterprises ERP projects have been carried out successfully.
Keywords :
business data processing; enterprise resource planning; scheduling; agile extreme programming model; medium enterprises ERP projects; task scheduling; time-related statistics information; two-dimensional dynamic time scheduling interface method; Dynamic programming; Dynamic scheduling; Enterprise resource planning; Hydroelectric power generation; Processor scheduling; Region 4; Software engineering; Statistics; Technology planning; Two dimensional displays; Enterprise Resource Planning (ERP); agile method; eXtreme Programming(XP); two-dimensional dynamic time scheduling;
Conference_Titel :
Software Engineering, 2009. WCSE '09. WRI World Congress on
Conference_Location :
Xiamen
Print_ISBN :
978-0-7695-3570-8
DOI :
10.1109/WCSE.2009.186