DocumentCode
507087
Title
Post-evaluation of Power Plant Flue Gas Desulfurization Project Based on Theory of Value Management
Author
Wu Yun-na ; Huang Ying-ying ; Huang Zhi-jun
Author_Institution
Bus. Adm. Sch., North China Electr. Power Univ., Beijing, China
Volume
2
fYear
2009
fDate
14-16 Aug. 2009
Firstpage
319
Lastpage
322
Abstract
With the rapid development of the Thermal Power Plant Flue Gas Desulfurization (FGD) industry, Desulfurization Project has a wide developing prospect in the present market. However, the levels of Desulfurization enterprises mix and owners are unfamiliar with the desulfurization project, which increase the investment and cannot reach the expected desulfurization effect. Applying the theory of value management in post-evaluation of Thermal Power Plant FGD, the paper identifies the focus management object of the desulfurization project with the help of the value coefficient, which can be used as references to the processes of controlling the desulfurization project cost and improving the integral effect of desulfurization project.
Keywords
electricity supply industry; flue gas desulphurisation; power markets; power system management; project management; thermal power stations; focus management object; power plant flue gas desulfurization project; thermal power plant flue gas desulfurization industry; value management theory; Costs; Energy management; Engineering management; Flue gases; Gas industry; Knowledge management; Power generation; Project management; Technology management; Thermal management; desulfurization project; post-evaluation; value management; value project;
fLanguage
English
Publisher
ieee
Conference_Titel
Fuzzy Systems and Knowledge Discovery, 2009. FSKD '09. Sixth International Conference on
Conference_Location
Tianjin
Print_ISBN
978-0-7695-3735-1
Type
conf
DOI
10.1109/FSKD.2009.147
Filename
5359462
Link To Document