• DocumentCode
    507087
  • Title

    Post-evaluation of Power Plant Flue Gas Desulfurization Project Based on Theory of Value Management

  • Author

    Wu Yun-na ; Huang Ying-ying ; Huang Zhi-jun

  • Author_Institution
    Bus. Adm. Sch., North China Electr. Power Univ., Beijing, China
  • Volume
    2
  • fYear
    2009
  • fDate
    14-16 Aug. 2009
  • Firstpage
    319
  • Lastpage
    322
  • Abstract
    With the rapid development of the Thermal Power Plant Flue Gas Desulfurization (FGD) industry, Desulfurization Project has a wide developing prospect in the present market. However, the levels of Desulfurization enterprises mix and owners are unfamiliar with the desulfurization project, which increase the investment and cannot reach the expected desulfurization effect. Applying the theory of value management in post-evaluation of Thermal Power Plant FGD, the paper identifies the focus management object of the desulfurization project with the help of the value coefficient, which can be used as references to the processes of controlling the desulfurization project cost and improving the integral effect of desulfurization project.
  • Keywords
    electricity supply industry; flue gas desulphurisation; power markets; power system management; project management; thermal power stations; focus management object; power plant flue gas desulfurization project; thermal power plant flue gas desulfurization industry; value management theory; Costs; Energy management; Engineering management; Flue gases; Gas industry; Knowledge management; Power generation; Project management; Technology management; Thermal management; desulfurization project; post-evaluation; value management; value project;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Fuzzy Systems and Knowledge Discovery, 2009. FSKD '09. Sixth International Conference on
  • Conference_Location
    Tianjin
  • Print_ISBN
    978-0-7695-3735-1
  • Type

    conf

  • DOI
    10.1109/FSKD.2009.147
  • Filename
    5359462