DocumentCode
507518
Title
Cost Control in the Design Stage of Transmit Electricity Projects Based on Value Engineering Method
Author
Huang, Yi ; Huang, Wenjie ; Shang, Yumin
Author_Institution
Coll. of Bus. Adm., North China Electr. Power Univ., Beijing, China
Volume
2
fYear
2009
fDate
Nov. 30 2009-Dec. 1 2009
Firstpage
308
Lastpage
311
Abstract
Transmit electricity projects have taken a significant importance in electricity construction in our country, with the large invest and long construction period, and also the construction quality is directly related to the useful time of the whole project, based on the above reason, the focus has turned to how to bring the invest into play and realize the maximized investment benefit. Therefore, this paper is aimed at to the cost control in the designing stage of transmit electricity projects, with analysis of the interrelation between technique and economy, also between cost and value, then to make a improvement to the design proposal of the transmit electricity projects.
Keywords
costing; electricity supply industry; power transmission economics; cost control; design stage; electricity construction; transmit electricity projects; value engineering method; Control systems; Cost function; Current control; Design engineering; Government; Knowledge acquisition; Knowledge engineering; Power engineering and energy; Power grids; Production; Value engineering; cost coefficient; cost control; function coefficient; lose electricity item;
fLanguage
English
Publisher
ieee
Conference_Titel
Knowledge Acquisition and Modeling, 2009. KAM '09. Second International Symposium on
Conference_Location
Wuhan
Print_ISBN
978-0-7695-3888-4
Type
conf
DOI
10.1109/KAM.2009.95
Filename
5361968
Link To Document