Multi-shop Rescheduling Problem under Rush Orders
Author
Hu, Yanhai ; Ye, Feifan ; Guo, Ziqing ; Zheng, Zizhao
Author_Institution
Fac. of Eng., Ningbo Univ., Ningbo, China
Volume
3
fYear
2009
fDate
14-16 Aug. 2009
Firstpage
40
Lastpage
44
Abstract
Multi-shop rescheduling problem (MSRP) in the condition of rush orders is put forward. Disjunctive graph is employed to demonstrate the MSRP. The weighted mean flow time of both original jobs and rush orders are used as objective function. The weight for rush orders is much bigger than that of original jobs, so the rush orders would be produced as early as possible in the new schedule. Ant colony optimization (ACO) algorithm is used to solve the MSRP. Numerical experiments are conducted. The results demonstrate that the rush orders are processed soon and the original jobs are not delayed much.
Keywords
job shop scheduling; optimisation; ant colony optimization; disjunctive graph; multishop rescheduling problem; rush orders; Ant colony optimization; Artificial neural networks; Delay; Dispatching; Job production systems; Job shop scheduling; Manufacturing systems; Production systems; Protocols; Uncertainty;
fLanguage
English
Publisher
ieee
Conference_Titel
Natural Computation, 2009. ICNC '09. Fifth International Conference on
Conference_Location
Tianjin
Print_ISBN
978-0-7695-3736-8
Type
conf
DOI
10.1109/ICNC.2009.330
Filename
5363707
Link To Document