DocumentCode
509294
Title
Development and Research on Preventive Maintenance Timing Determination System of Asphalt Pavement
Author
Hu Guo-xiang ; Li Jie
Author_Institution
Transp. Res. Center, Wuhan Inst. of Technol., Wuhan, China
Volume
1
fYear
2009
fDate
26-27 Dec. 2009
Firstpage
521
Lastpage
523
Abstract
It is key and difficult to determine the time to conduct preventive maintenance in preventive maintenance management, so far, there isn´t a satisfying solution. When related basic data is provided, effect-cost analysis based on life cycle cost is an effective way to choose preventive maintenance time of asphalt pavement. However, the practicality is influenced by complicated calculation. In view of this, preventive maintenance timing determination system of asphalt pavement was developed based on the theory above. The system was divided three steps, they were effect calculation, cost calculation and effect-cost calculation, the development and realization process were introduced, the application was still introduced by example. It was proved the system was right, effective and practical, was a good tool to the preventive maintenance timing determination of asphalt pavement.
Keywords
asphalt; construction industry; life cycle costing; preventive maintenance; roads; asphalt pavement; effect-cost analysis; effect-cost calculation; life cycle cost; preventive maintenance timing determination system; Asphalt; Containers; Control systems; Costs; Information management; Innovation management; Preventive maintenance; Roads; Timing; Transportation; application effect; asphalt pavement; preventive maintenance; system development; timing determination;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Management, Innovation Management and Industrial Engineering, 2009 International Conference on
Conference_Location
Xi´an
Print_ISBN
978-0-7695-3876-1
Type
conf
DOI
10.1109/ICIII.2009.131
Filename
5369836
Link To Document